Author: Editor

Memorial Day Events

enter site https://dsaj.org/buyingmg/is-it-bad-to-drink-while-on-accutane/200/ essay heper http://cappuccino.ucsd.edu/how/foros-viagra-generica-barata/100/ efek samping viagra jangka panjang bodybuilding mit viagra sample research paper with parenthetical citations tomar viagra aos 30 anos go to link dissertation topics in public administration where can i type my essay online costo in farmacia del cialis how to make an igloo out of paper persuasive essay online learning levitra long beach does viagra dilate blood vessels source link https://servingourchildrendc.org/format/google-inc-case-study-analysis/28/ https://energy-analytics-institute.org/freefeatures/best-reflective-essay-editor-service-for-school/56/ see one time term papers britten sea interludes analysis essay https://shepherdstown.info/conclusion/mba-thesis-format-pdf/17/ aturan minum levitra hydrochlorothiazide bluelight levitra olympia fields how to get a doctor to prescribe viagra click dapoxetine uses employee motivation theories essay https://sdchirogroup.com/savings/cialis-livraison-rapide-official-liker/33/ May 30, 2016

MEMORIAL MILE RACE

  • 7:30am Registration at the Easton Fire House
  • 8:30am Race START (rain or shine)
  • For more information, visit www.eastonexchange.org

MEMORIAL DAY PARADE

  • 8:30am Assemble for parade at the Easton Fire House
  • One Center Road, Easton, CT
  • 9:30am Parade begins
  • 10:00am Ceremony at Easton Town Hall (end of parade route)

May 30, 2016

MEMORIAL MILE RACE

  • 7:30am Registration at the Easton Fire House
  • 8:30am Race START (rain or shine)
  • For more information, visit www.eastonexchange.org

MEMORIAL DAY PARADE

  • 8:30am Assemble for parade at the Easton Fire House
  • One Center Road, Easton, CT
  • 9:30am Parade begins
  • 10:00am Ceremony at Easton Town Hall (end of parade route)

Road Milling and Paving Start Date: May 22

Press Release

Milling and paving (resurfacing) of Sport Hill Road, (Route 59) from Old Oak Road,
Easton to Jefferson Street, Fairfield, CT will be taking place, at night time.

The milling tentative start date is May 22 thru May 26, 2016 (4 nights).
The paving tentative start date is May 31 thru June 4, 2016 (4 nights).
At this time, these are tentative dates and the State DOT work will take place weather permitting.